Beyonce’s “Formation’ world tour is one of the highest profile and most talked about
of the year so far, with everyone wowed by the massive “Monolith’, a 4-sided LED /
video sculpture that moves and rotates and is right at the heart of a spectacularly
elegant production fusing expressionist art and innovative stage technology.
The 20 metre high by 20 metre wide Monolith is 10 metres deep and was created by
production designer Es Devlin working in close conjunction with Beyonce herself
who is involved in all the major details of her stage presentation. It takes the
striking beauty, isolation and simplicity of a Monolith design concept to amazing
new levels.
The object opens 7.3 metres in the middle, tracks – as two sections on sliding grids
– and rotates 360 degrees, a feat of engineering enabled by Belgian automation
specialist WIcreations who designed the rotation and sliding system for Stageco,
who built the moving elements of the stage.
The Monolith is clad with 9mm Winvision LED on the wide sides and 18 mm on the
narrower sides, weighs a mighty 180 tonnes … and is easily the largest object in all
the stadiums they are playing.
Hans Willems from WIcreations led the automation side of the project. During two
brainstorming sessions with Dirk De Decker (DDD) from Stageco, Willems
convinced DDD that he had a simple and reliable solution to move the two sliding
grids manufactured by Stageco.
Right at the bottom of the Monolith structure assembly is a circular base track
designed by Stageco and manufactured by TCS. On top of this are two large bogie
frames, rolling on 8 x 30-tonne rated caster wheels, four of which are driven by the
WI control system which works similar to a 4×4 vehicle to produce the rotation …
via four drive motors which are perfectly synchronised via the WI control software!
On top of the two bogie frames, Stageco manufactured a large static grid to support
the two sliding structures that open and close the Monolith.
The idea was that the box rides on top of the static grid which takes all the vertical
loads, while the horizontal loadings (wind and movement) are transferred via 16 x
BGV C1 hoists running in unison via the WI hoist control system.
This design can move the structure safely in wind speeds of up to 20 m/s (around
72 Km/h or 45 mp/h) and provides all the stability needed as well as being
tourable.
WI created the two complete automation systems which are leap-frogging with the
tour’s production, so all hoists were built into custom frames to maximize speed on
get-ins and outs. The custom hoist frames were supplied with transparent skins for
rain protection and to give a clear view for visual checks to the system.
Stageco built the revolving/sliding section of the stage, WI designed and supplied
the automation elements and custom “halo’ rigging grids, TAIT delivered various
other parts of the staging, Neg Earth is the major lighting provider for US and
European legs of the tour, and PRG Nocturne is supplying video equipment.
